新書推薦:
《
先秦汉魏晋南北朝诗(附作者篇目索引)(全四册)精——中国古典文学总集
》
售價:HK$
597.6
《
财之道丛书·太古传:商业帝国200年
》
售價:HK$
153.6
《
不要相信你所想的一切:如何停止过度思考,克服焦虑、自我怀疑和自我破坏
》
售價:HK$
50.4
《
万历四大征(全两册)
》
售價:HK$
117.6
《
凝望:我的摄影与人生
》
售價:HK$
129.6
《
工业机器人从基础到实战
》
售價:HK$
153.6
《
重症产科.1
》
售價:HK$
71.8
《
财之道丛书·表层的真理:当代经济学与社会
》
售價:HK$
105.6
|
目錄:
|
Contents
1 Offshore Platform Topsides and Substructure 1
1.1 Platform Topsides 2
1.2 Design of Offshore Platform Topsides and Substructures 6
1.2.1 Topsides Design in General 6
1.2.2 Modular Topsides, Integrated Topsides and Single Lift Topsides 9
1.2.3 Jacket Design 21
1.3 Consideration of Construction and Integration of Topsides and Substructure 23
1.3.1 Platform Design Strongly Related to the Methodology of Platform Integration 23
1.3.2 Impact of Changing Integration Method 26
References 34
2 Platform Integration and Stationing 35
2.1 Self Installable Platform 36
2.1.1 Jack-Ups 36
2.1.2 SIP II Platform [9] 41
2.1.3 EDP [13–15] 48
2.2 Inshore Integration [16] 51
2.2.1 Inshore Topsides Integration by Heavy Lifting 54
2.2.2 Inshore Platform Integration by Floatover 58
2.2.3 Moving-in-Under [23–25] 65
2.3 Offshore Integration 71
2.3.1 Topsides Installation by HLCV [26, 27] 71
2.3.2 Offshore Topsides Installation by Floatover 76
2.3.3 Challenges and Development 82
2.4 Summary 84
References 85
3 Floatover Technology 87
3.1 Floatover Concept 87
3.2 Advantages of Floatover Method [7–10] 94
3.3 Category of Floatover Technology 98
References 99
4 HIDECK Floatover Technology 101
References 114
5 UNIDECK and SMARTLEG 115
5.1 UNIDECK Floatover 115
5.2 Comparison UNIDECK to HIDECK 116
5.3 UNIDECK Equipment and Operation 118
5.4 Advantages of UNIDECK Method Comparing
to the HIDECK Method 123
5.5 SMARTLEG Installation Method 125
5.6 Application of SMARTLEG Technology [9, 10] 127
References 129
6 Catamaran Floatover 131
6.1 Multi-vessel Floatover 131
6.2 “Catamaran Floatover” Origination 133
6.3 Catamaran Floatover Technology 137
6.3.1 General Discussion 137
6.3.2 Catamaran Floatover Categories 141
6.4 Technical Challenges 146
6.4.1 One Extra Operation Phase 146
6.4.2 Mating Operation 151
References 151
7 Project Management and Planning 153
7.1 Offshore Installation Projects 153
7.1.1 Features of T&I Projects 154
7.1.2 Project Team and Its Main Functions [5] 157
7.2 Project Management and Project Organizations 177
7.2.1 Project Management 177
7.2.2 Project Organizations and Organization Charts 178
7.3 PM Project Manager 180
7.4 PEP Project Execution Plan 182
7.5 IM Installation Manual 183
7.6 Summary Comments 188
References 189
8 Engineering Analysis and Model Test 191
8.1 Engineering Plays a Vital Role in Floatover Projects 191
8.1.1 Engineering Team on the Project 192
8.1.2 Engineers—Their Quality and Challenges 193
8.2 Categories of Engineering Work 195
8.2.1 Installation Criteria Set Up 195
8.2.2 Analysis and Simulation Supporting Operation Procedure Development 196
8.2.3 Floatover Equipment Design and Qualification 196
8.2.4 Emergency Handling 197
8.2.5 On-Site Supporting 197
8.2.6 Model Test 197
8.3 Engineering Work Quality Management 198
8.3.1 AnalysisDesign Philosophy 198
8.3.2 DB 198
8.3.3 Analysis and Design Procedures 198
8.3.4 Involvement in the Early Stage of the Project 199
8.4 Analysis and Simulation Work 199
8.4.1 Stability Analysis 199
8.4.2 Transportation Motion Simulation and Hydrodynamic Load Calculation 200
8.4.3 Topsides Transfer Simulation and Catamaran System Transportation 202
8.4.4 Floatover Simulation [2–4] 204
8.5 Structural Analyses 210
8.5.1 Global Structural Analysis 210
8.5.2 Topsides Integrity Checking 211
8.6 Design Work [5] 212
8.6.1 DSS DSF Design 212
8.6.2 LMU [6] 216
8.7 Model Test for Transportation and Floatover Operation 220
8.7.1 Main Contents of Model Test Specification 220
8.7.2 Motion Decay Test 223
8.7.3 Transportation Model Test 223
8.7.4 Pre-mating Test 224
8.7.5 Mating Test 225
8.7.6 Model Test Results and the Data Evaluation [7–9] 226
8.8 Summary 227
References 228
9 Operation Execution 229
9.1 Installation Procedures and IFC Drawings 229
9.2 Platform Integration Operation Activities 231
9.3 Task Force Management 232
9.4 Loadout and Pre-sailaway 234
9.4.1 Preparations 235
9.4.2 Weather Broadcasting and Tide Survey 243
9.4.3 Loadout Operation 244
9.4.4 Post Loadout and Pre-sailaway Preparation 249
9.5 Topsides Installation 250
9.5.1 Field Preparation 251
9.5.2 Stand-by Stage Activities 253
9.5.3 Pre-docking Stage Activities 254
9.5.4 Docking Stage 255
9.5.5 Pre-mating Stage 256
9.5.6 Mating Stage 257
9.5.7 UndockingWithdrawal Stage 259
9.6 Post-installation Operation 259
9.6.1 In-field Activities 260
9.6.2 Vessel Demobilization Preparation 260
9.7 Mating Operation Contingency Procedure 260
9.8 Summary 261
References 262
10 Evolution and New Source of Motivation 263
10.1 Retrospect of the Application of Floatover Technology 263
10.2 Evolution 266
10.3 Concept Derived from Conventional Floa
|
|